Associated Company

Working Hours

Mon - Fri: 09.00am - 10.00pm

Quick Contact

01895 430 396
0118 380 5388

Email Us

rebar@24r.co.uk

Sequence guide for raft foundation.

Sequence guide for raft foundation.

1) Spacers for under cages and bottom mesh (Dark Red)

These are used to maintain the correct position of the cages above the bottom mesh, ensuring stability and proper concrete cover

2) Cages with runners (black) + Links (lilac) and Lapping bars(green) to join cages to each other

The cages are equipped with runners for stability and are connected to each other using lilac-colored links.Green lapping bars provide additional structural integrity

3) Bottom mesh link bars (orange) link bottom mesh to cage.

These bars link the bottom mesh to the cage, providing a secure attachment and ensuring that the mesh remains in place

4) Bottom mesh (Black)

This layer of mesh lies at the base of the cage setup, providing foundational support for the structure.

5) Hy Chairs (Blue) to separate layers of Mesh to required height,

These chairs are used to separate layers of mesh to the required height, ensuring that each layer is correctly spaced for optimal reinforcement.

6) Top Mesh (Black) overlapping the cage

The top mesh overlaps the cage, adding an additional layer of reinforcement to the structure

7) Top mesh link bars (orange) joining mesh to cage

Similar to the bottom mesh link bars, these are used to join the top mesh securely to the cage.